ZBMS Equipment - Glovelier

Project Data

 

Customer: Chemins de fer du Jura
Reference: Richard Zuber
Location: Glovelier
Contract:Domino 67 Equipment with ZBMS Train Control System
Cost: 90'500 CHF
Start:October 2016
Commissioning:July 2018
Project Manager: Sascha Schneider

 

Our Contract

 

Equipping Glovelier station and the adjacent line to Combe-Tabeillon with the new train control standard for metre and special gauge (ZBMS).

Our Services

 

  • Railway-specific Project Planning Fundamentals: Development and Consulting for the Customer
  • Planning and Equipment Concept Pilot site
  • Preparation of Construction Documents
  • Project Planning for Interlocking Adjustments
  • Configuration of the ETCS-Telegram

Specific Highlights

 

This project is a pilot project for both the Chemins de fer du Jura (CJ) and BÄR Bahnsicherung. This was the first time that we provided a complete service package, from planning and project management to installation and commissioning. For CJ, the new train control standard and the associated operating regulations were used for the first time at Glovelier station.

Product Quantity Structure

Equipment Elements:
5Main Signals
1Advance Signal
2Level Crossings on the Line
  
Installed ZBMS Components:
10Transparent Balises
16Fixed Data Balises
2Euroloops
9Lineside Electronic Units (LEU)
2Euroloop Modems (ELM)

         